BLUEPRINT INSIGHT
AUDIO™
Stop squinting at blueprints. Our AI narrates every critical detail, conflict, and cost-saving opportunity directly into your ears. Drive to the site while the plans brief you.
"Detail 6 on Sheet S-3.2: The W14x68 beam at grid line F conflicts with the 18-inch duct shown on M-2.1. This will require either a beam depth reduction or duct rerouting. Estimated field coordination cost: $8,500. Recommend addressing in RFI before fabrication..."
WHY CONTRACTORS ARE LISTENING
Conflict Detection
AI identifies clashes between trades before they become $50K+ field fixes.
Cost-Saving Insights
Hear exact locations of material waste and over-spec opportunities.
Podcast-Style Narration
Easy and enjoyable to listen to. Get insights in a conversational format while multitasking.
Code Compliance
Automated alerts for code violations and permit-critical issues.
REAL INSIGHTS FROM REAL PROJECTS
Riverside Tower
Structural Frame - Grid Line 8
"Beam depth conflict with HVAC routing detected at elevation 42'6". Recommend 18" I-beam instead of 24" to maintain clearance."
Metro Office Complex
Foundation Detail - Zone C
"Footing reinforcement spacing exceeds code maximum by 3 inches. Requires additional #5 rebar at 12" O.C."
Coastal Retail Plaza
Roof Assembly - Bay 4
"Specified insulation R-value insufficient for climate zone. Upgrade to R-38 will save $12K annually in energy costs."
HEAR YOUR BLUEPRINTS TALK
Upload your plans. Get narrated insights in 24 hours. Catch conflicts before they cost you.